来源:http://www.jndclyyxgs.com/ 发布时间:2023-01-31
传统的外墙保温施工方法有穿墙螺丝和木方两种,在保温板上开穿墙螺丝孔,容易损坏铝卷,后期还需要进行封堵,大大提高了施工成本,也可以采用穿墙螺钉、木方、背楞相结合的方式进行加固施工,施工过程繁琐,在墙体中间放置水泥支撑条,以保证墙体的截面尺寸,而穿墙螺钉加固的背楞可根据工人施工经验的熟练程度进行调整,施工难度越大,质量就越难保证。
There are two traditional construction methods for external wall insulation: through-wall screws and wooden battens. Opening through-wall screw holes on the insulation board is easy to damage the aluminum coil, and later plugging is also required, which greatly increases the construction cost. Also, the combination of through-wall screws, wooden battens, and back ribs can be used for reinforcement construction. The construction process is cumbersome, and the cement support strip is placed in the middle of the wall to ensure the section size of the wall, The back ridge reinforced by through-wall screws can be adjusted according to the proficiency of the workers' construction experience. The more difficult the construction is, the more difficult it is to ensure the quality.
冬季的外墙保温装置一般包括外墙模板、位于外墙模板一侧的保温板和多个紧固装置,外墙模板包括平行于保温板的模板体和从模板体向远离保温板的方向延伸的多个侧板。但是外墙保温板在使用时是有缺陷的,一是保温板间的连接不紧密,二是外保温板不易更换。铝卷生产厂家提醒,为了解决这一问题,现在采用的是铝卷与外墙保温板相结合的保温方式。
The external wall thermal insulation device in winter generally includes the external wall template, the thermal insulation board on one side of the external wall template and multiple fastening devices. The external wall template includes the template body parallel to the thermal insulation board and multiple side plates extending from the template body to the direction away from the thermal insulation board. However, there are defects in the use of the external insulation board. First, the connection between the insulation boards is not tight, and second, the external insulation board is not easy to replace. The aluminum coil manufacturer reminded that in order to solve this problem, the thermal insulation method combining the aluminum coil with the external wall thermal insulation board is now adopted.
铝材与外墙保温板相结合的施工结构,主要包括保温板、钢筋混凝土现浇结构、铝模内墙板、方管夹具、方管背边和一次性拉片。
The construction structure combining aluminum material and external wall insulation board mainly includes insulation board, reinforced concrete cast-in-place structure, aluminum mold inner wall panel, square tube clamp, square tube back edge and disposable tab.
钢筋混凝土现浇结构的内外侧分别设有铝模内墙板和保温板,保温板的外侧还设有固定保温板的钢架,一次性拉片的两端穿过铝模内墙板和保温板固定钢架,一次性拉片的两端与方管夹具连接,使得方管夹具相互对拉时,铝卷和铝模内墙板锁定在钢筋混凝土现浇结构的两侧。
The inner and outer sides of the reinforced concrete cast-in-place structure are respectively equipped with aluminum mold inner wall panels and thermal insulation panels, and the outer side of the thermal insulation panel is also equipped with a steel frame for fixing the thermal insulation panel. The two ends of the one-time pull tab pass through the inner wall panels of the aluminum mold and the thermal insulation panel to fix the steel frame. The two ends of the one-time pull tab are connected with the square tube clamps, so that when the square tube clamps are pulled against each other, the aluminum coil and the aluminum mold inner wall panels are locked on both sides of the reinforced concrete cast-in-place structure.
铝模内墙板上方设有竖向的楼板模板,楼板模板与铝模内墙板通过楼板转角槽连接;铝模内墙板的底部还铰接有墙板撑杆,墙板撑杆的另一端固定在地面上;保温板的高度超过其所在楼层高度50mm。
A vertical floor template is set above the aluminum mold inner wall panel, and the floor template is connected with the aluminum mold inner wall panel through the floor corner slot; The bottom of the wallboard in the aluminum mold is also hinged with a wallboard brace, and the other end of the wallboard brace is fixed on the ground; The height of the insulation board is 50mm higher than the height of its floor.
双拉结构可以实现铝卷的锁定,安装更加方便,对工人施工经验的依赖非常低。一次性双拉片根据壁厚尺寸定制,不需要水泥支撑条,减少了工序和成本。施工完成后,上下轻敲即可取下,不留大孔,无需后期堵孔作业。您对此有怎样的疑惑就来我们网站http://www.jndclyyxgs.com咨询吧!
Double-pull structure can realize the locking of aluminum coil, which is more convenient to install, and has very low dependence on the construction experience of workers. The disposable double pull piece is customized according to the wall thickness and does not need cement support strip, which reduces the process and cost. After the completion of the construction, it can be removed by tapping up and down, without leaving large holes, and there is no need for later plugging operations. If you have any doubts about this, please come to our website http://www.jndclyyxgs.com Ask!