来源:http://www.jndclyyxgs.com/ 发布时间:2018-04-27
1、材料及要求:
1, materials and requirements:
a.铝合金板:铝合金方板的规格600*600,厚度0.8毫米,孔径¢3,穿孔率15%,铝合金条板136宽搭接型铝合金条板面层穿孔,板尺寸一致,颜色均匀,无裂纹、折断、缺棱掉角。物品在运输过程中一定要轻拿轻放,严禁受潮淋雨,得存放于干燥的环境、通风、避雨、下垫木板,要与墙壁保持一定的距离。
A. aluminum alloy plate: aluminum alloy square plate specification 600*600, thickness 0.8 millimeter, aperture 3, perforation rate 15%, aluminum alloy strip 136 wide lap type aluminum alloy strip surface layer perforation, plate size uniform, uniform color, no crack, break, edge off angle. In the course of transportation, it is necessary to take light and light in the course of transportation. It is strictly prohibited from wet rain. It must be stored in a dry environment, ventilation, shelter, and underlay wood. It is necessary to keep a certain distance from the wall.
b.铝合金方板吊顶龙骨:T型轻钢龙骨横撑TB2*26,T型轻钢次龙骨TB23*23,U型轻钢主龙骨CB30*12、轻钢次龙骨LB50*26、U型轻钢主龙骨CB38*12。
B. aluminum alloy square plate ceiling keel: T type light steel keel cross brace TB2*26, T type light steel sub keel TB23*23, U type light steel main keel CB30*12, light steel sub keel LB50*26, U type light steel main keel CB38*12.
c.零配件:吊杆、角码、丝杆和螺母、射钉、自攻螺钉、膨胀螺栓。
C. spare parts: suspender, corner code, screw and nut, nail, self tapping screw and expansion bolt.
2、主要机具:
2. Main machine tools:
a.电动工具:电锯、无齿锯、手电锯、手电钻、冲击电锤、电动螺丝刀、电焊机。
A. electric tools: electric saw, toothless saws, hand saw, hand drill, impact hammer, electric screwdriver, electric welding machine.
b.手动工具:射钉枪、拉铆枪、气动直钉枪、气动码钉枪、手锯、手刨子、钳子、扳手、水准仪靠尺、钢卷尺等。
B. manual tools: nail gun, rivet gun, pneumatic straight nail gun, pneumatic nail gun, hand saw, hand plane, pliers, spanner, level gauge, steel tape and so on.
3、工作条件
3. Working conditions
a.施工前应熟悉现场、图纸和设计说明。
A. familiarity with site, drawings and design instructions before construction.
b.设计要求对房间的净高、门洞标高和吊顶内的管道、设备及其支架的标高进行交接检测。
The B. design requires that the height of the room, the height of the doorway and the elevation of the plumbing, the equipment and the support of the ceiling should be checked.
c.材料进场验收记录、检验报告、出厂合格证应齐全。
C. material acceptance check, inspection report and factory qualification certificate should be complete.
d.吊顶内的管道、设备安装完成;罩面板安装前上述设备应检验、试压验收合格。
The installation of pipe and equipment in the D. ceiling will be completed. The above equipment should be checked and tested before acceptance.
e.罩面板安装前,墙、柱面装饰基本完成,涂料只剩较后一面漆并验收合格。
Before the E. panel was installed, the wall and cylinder decoration were basically completed. Only one last coat of paint was left.
f.行样板工程,在样板验收合格后,再进行大面积吊顶。
F. carries out the prototype project first, then carries on the large area ceiling after the model acceptance is qualified.
关于铝板生产厂家http://www.jndclyyxgs.com就先介绍到这里了,相信大家在实际的工作中会用到相关知识,如果您有这方面的需要,欢迎前来选购。
On the aluminum manufacturer http://www.jndclyyxgs.com first introduced here, I believe that you will use the relevant knowledge in the actual work, if you have the needs of this area, welcome to buy.